Project Name : | RG1 | Device Name : | Road2 | Date : | 27-05-2022 |
---|---|---|---|---|---|
Client : | Engineer | FEH Rainfall Design : | Point Data at 318358,171432 |
1 | Climate Change and Urban Creep | 40 % |
---|---|---|
2 | Return Period | 100 years |
3 | Rain Event Duration | 360 mins |
4 | FEH Rainfall Depth | 121.24 mm |
5 | Catchment Area | 180 ㎡ |
1 | Depth of substrate | 400.00 mm |
---|---|---|
2 | Freeboard depth | 150 mm |
3 | SHC (Saturated Hydraulic Conductivity) | 200 mm/hr |
4 | Available Field Capacity | 14 % |
5 | Plan area of Raingarden | 30.00 ㎡ |
6 | Substrate and sub-base batter | 33 degrees |
7 | Slope factor | 100 % |
1 | Max flow rate at invert | 1.4 l/s |
---|---|---|
2 | Min outlet size | 100 mm |
3 | Min infiltration rate* (*for infiltration only design) | 0.00E+00 m/s |
4 | Exceedance volume | 4172 l |
5 | Max exceedance rate | 3 l/s |
6 | Min overflow size | 100 mm |
7 | No. of overflows required | 1 |
8 | Design Suitability | OK |