Upfront Information |
|
|---|---|
| Service Rate (cost / hr) |
|
| On Average, Scrap Selling Price (per ton) |
|
| On Average, Production Rate (tons / hr) |
|
Current Scenario |
In Weeks | In Hours | |
|---|---|---|---|
| On average, how frequently are blades flipped? | How long does it take? | ||
| On average, how frequently are blade replaced? | How long does it take? | ||
| On average, how frequently are blade seats repaired? | How long does it take? | ||
| On average, how frequently are wear surfaces built up and hard faced? | How long does it take? |
Detailed Analysis |
|||||
|---|---|---|---|---|---|
| Procedure | Current Downtime | Total New Time | Current Direct Labor Costs | New Direct Labor Costs | Increased Productivity |
| Blade Flips |
|
|
|
||
| Blade Replacements |
|
|
|
||
| Blade Seat Repair |
|
|
|
||
| Build-Up |
|
|
|
||
| Total |
|
|
|
||
Results |
|||
| Current Shear | New System | Reduction | |
|---|---|---|---|
| Annual cost of maintenance |
|
|
|
| Annual downtime(hours) |
|
|
| Increased Productivity |
|
|---|