Upfront Information |
|
---|---|
Service Rate (cost / hr) |
|
On Average, Scrap Selling Price (per ton) |
|
On Average, Production Rate (tons / hr) |
|
Current Scenario |
In Weeks | In Hours | |
---|---|---|---|
On average, how frequently are blades flipped? | How long does it take? | ||
On average, how frequently are blade replaced? | How long does it take? | ||
On average, how frequently are blade seats repaired? | How long does it take? | ||
On average, how frequently are wear surfaces built up and hard faced? | How long does it take? |
Detailed Analysis |
|||||
---|---|---|---|---|---|
Procedure | Current Downtime | Total New Time | Current Direct Labor Costs | New Direct Labor Costs | Increased Productivity |
Blade Flips |
|
|
|
||
Blade Replacements |
|
|
|
||
Blade Seat Repair |
|
|
|
||
Build-Up |
|
|
|
||
Total |
|
|
|
Results |
|||
Current Shear | New System | Reduction | |
---|---|---|---|
Annual cost of maintenance |
|
|
|
Annual downtime(hours) |
|
|
Increased Productivity |
|
---|